Hotel Project Checklist

Hotel Shading Mock-Up Acceptance Checklist Before Repeated Room Release

A hotel-room mock-up checklist for reviewing fabrics, edge conditions, alignment, controls, service access, defects and retest before repeated-room release.

Direct answer

What should the buyer do?

Treat the representative room as a controlled approval stage. Define the room/opening, selected layers and project-specific acceptance criteria before inspection. Record observations, defects, correction and retest, then state exactly which repeated-room scope is accepted or remains on HOLD.

Why this matters

A visually acceptable sample at one opening may not answer control, access, blackout, stacking or coordination requirements for repeated rooms. A signed scope avoids treating silence or one photograph as approval.

Anonymous installed shade edge condition used for mock-up review planning.
Anonymous installed visual as issue illustration only.

Hotel Mock-Up Acceptance Record

Hotel Mock-Up Acceptance Record
Review area What to record Decision
Identity Room type, opening ID, drawing and selected system MATCH / OPEN
Fabric and layers Codes, orientation, sheer/decorative alignment ACCEPT / HOLD
Edge condition Mounting, channels, overlaps and observed light Project criterion required
Control Applicable local/group/scene functions NOT_TESTED until observed
Service access Removal/access route for selected build OPEN / ACCEPT
Appearance Alignment, stacking and visible interfaces Project criterion required
Defect / retest Issue, correction, evidence and reviewer HOLD until closed
Release scope Named room/opening types and authority PENDING / ACCEPT

Download Hotel Mock-Up Acceptance Record (XLSX)

Information to collect

  • Approved room type and opening IDs
  • Selected fabrics/layers and hardware
  • Project-defined criteria
  • Control functions in scope
  • Defect owner and retest evidence
  • Named release authority

What Saiwenna can review

Saiwenna can review selected-product information, opening coordination and supplied-scope evidence. The hotel, consultant and appointed project parties define and approve acceptance criteria.

There is no universal light-gap, noise or appearance tolerance. This page does not claim an unnamed completed Saiwenna mock-up.

Typical Planning Scenario

Typical Planning Scenario — not a completed Saiwenna project: one representative room is inspected, an edge/alignment issue is recorded, the correction is retested and only the named repeated-room type is released.

Standardized Mock-Up Evidence Capture

  • Use the same opening ID, viewing position and lighting condition.
  • Record the criterion before the observation.
  • Keep defect, correction, retest and release scope linked.

Standardized Mock-Up Evidence Capture

  • Use the same opening ID, viewing position and lighting condition.
  • Record the criterion before the observation.
  • Keep defect, correction, retest and release scope linked.

Send a reviewable project brief

Send the current records, selected product information and unresolved decisions. Do not send passwords, private network credentials or unnecessary personal data.

Send Mock-Up Review Pack