Technical Verification Guide

How to Check Skylight Shade Span and Slope Claims Before Specification

Verify whether a skylight shade span, size or slope claim applies to the exact system, motor, orientation and project environment.

Direct answer

What should the buyer decide?

Treat every maximum as configuration-specific. Maximum width does not automatically mean that width is available at every length, slope, fabric, motor or environment. Record the exact system and source document; leave missing cells NOT_DOCUMENTED instead of estimating.

Skylight Claim Applicability Matrix

Skylight Claim Applicability Matrix
Claim field Required record Gate
System / model Exact supplier system and revision REQUIRES_CONFIRMATION
Drive / motor Drive architecture and motor pairing NOT_DOCUMENTED if absent
Orientation Horizontal, inclined or vertical applicability Exact statement required
Span / width Claimed value and conditions No extrapolation
Length / travel Claimed value and combined-limit rule No independent maximum assumption
Slope Range and configuration conditions Project geometry required
Guide / tension / fabric Architecture and material scope Must match offered build
Environment Indoor/outdoor and exposure boundary Supplier/project review
Basis Document, test or engineering basis Source and revision required

Download Skylight Claim Applicability Matrix (XLSX)

What the buyer provides

  • Skylight section and dimensions
  • Slope and orientation
  • Indoor/outdoor exposure
  • Selected system/motor documents
  • Fabric and guide/tension method
  • Required acceptance basis

What Saiwenna can review

Saiwenna can organize supplier/model evidence and identify missing applicability fields. Final specification requires project and responsible engineering review.

No Saiwenna-wide maximum size or slope is published. Supplier catalog limits are not automatically project-approved limits.

Evidence Hierarchy for Limit Claims

  1. Exact model and current supplier document.
  2. Configuration-specific combined-limit statement.
  3. Project geometry and exposure review.
  4. Named engineering/specification approval.

Evidence Hierarchy for Limit Claims

  1. Exact model and current supplier document.
  2. Configuration-specific combined-limit statement.
  3. Project geometry and exposure review.
  4. Named engineering/specification approval.

Send a project-specific review brief

Send the selected product, relevant drawings/documents and unresolved constraints. Do not send passwords, network credentials or unnecessary personal data.

Send Skylight Geometry & Claim