Motorized Shade Preconstruction Drawing Checklist for Architects

Prepare coordinated plans, elevations, sections, opening IDs, recess, drive-side, access, power and control notes before shading is frozen.

Quick Answer

Issue the shading package as a coordinated set, not isolated dimensions. Each opening needs a stable ID across plan, elevation, section and schedule. Show the proposed recess, mounting surface, drive side, service route, power point and control note. Mark the responsible discipline and supplier-review requirement for every unresolved decision before construction documents are frozen.

Preconstruction Drawing Completeness Register

Architectural drawing completeness
Drawing / record Must identify Open decision / owner
Plan Room, opening ID, orientation and control-zone context Missing/changed opening reference
Elevation Coverage, finished interfaces, drive-side orientation Visible alignment or privacy/daylight decision
Section Recess/pocket, mounting surface, access and removable finish Selected-system clearance/support evidence
Opening schedule Size basis, units, site-measurement state and revision Dimension reconciliation / measurer
Electrical note Power point, motor-side path and interface route Electrical designer / integrator
Decision register Supplier review, third-party approval and deadline Named owner and hold/release state

What Each View Prevents

Plan

Prevents room/opening identity and orientation from being lost.

Elevation

Makes coverage, visible alignment and drive-side references reviewable.

Section

Tests whether mounting, service access and finished interfaces can coexist.

Design Responsibility and Review Output

Drawing responsibility boundary
Party Provides / decides Review output
Architect / designer Current geometry, finish intent, opening IDs and design issue Coordinated drawings and named open decisions
Saiwenna Selected-system information within documented scope System direction, supplier detail requests and quotation assumptions
Structural / electrical / integrator teams Approved support, power, wiring, interface and local requirements Discipline approval, marked changes and commissioning scope
Installer / contractor Site condition and buildability feedback Installation/access constraints and closure hold items

Hold Points Before Drawing Freeze

  • Opening IDs and measurement basis agree with the schedule.
  • Drive end has one defined viewing orientation.
  • Recess and mounting surface are not assumed from a generic detail.
  • Power/interface routes reach the selected drive side.
  • Service/removal route remains possible after finishes.
  • Every unresolved decision has an owner and issue date.

Download the Drawing Completeness Register

Download Preconstruction Drawing Completeness Register (XLSX)

The register records whether information is present and who owns the next decision. It does not certify structure, clearances or electrical design.

Synthetic Drawing-Issue Example

Opening DEMO-LV-03 appears in plan and elevation but the section still shows no access panel or drive orientation. The schedule remains PRELIMINARY. The register marks service access and drive-side detail as HOLD, assigns owners, and prevents the absence of a note from being mistaken for approval. Synthetic example, not a real customer drawing.

Quotation-Stage Reference

The U.S. Preconstruction Shading & Control Coordination Case demonstrates quotation-stage decision coordination. It is not presented as an installed or completed project.

Send a Reviewable Brief

Send plans, elevations, sections, opening schedule, current revision and a list of unresolved decisions.