Technical & Project Resources
Public-safe documents and templates organized by the work a dealer, installer, integrator or project team needs to complete.
Direct downloads are clearly separated from project-specific documents that require qualification.
Technical Working Packs
Choose the working resource that matches the project review task. These tools organize inputs; they do not confirm a final configuration.
Controls & Integration
Review compatibility boundaries, wiring inputs and responsibility before selection.
Curtain & Roller Selection
Prepare route, opening, mounting, material and control inputs for the requested system.
Curtain Track Technical / Selection Pack · Roller Shade Technical Pack
BOQ & Hospitality Planning
Organize schedules, approvals, room/opening references, packing and project handoff.
BOQ + Window Schedule Template · Hospitality Room Schedule / Project Pack
Skylight Selection Matrix
Record skylight geometry, access, mounting, drive, power and approval inputs.
Direct Downloads
Project Qualification
Project Pack
Products, controls, real cases, QC, packing, samples, warranty and RFQ inputs.
Controls
Motor & Control Compatibility Overview
A configuration-scoped public overview; exact motor, controller, gateway and interface remain subject to project confirmation.
Quality
Sample QC Checklist
Example checkpoints only. Actual inspection scope depends on the selected product and order requirements.
Packing
Packing & Labeling Summary
Product-specific protection, long-item planning and conditional room/opening references.
Commercial
Warranty & After-Sales Summary
A concise explanation of configuration-specific warranty and evidence-led issue review.
Commercial
Sample Evaluation Process
Sample purpose, configuration, pricing, freight, approval and move-to-order workflow.
Measurement
Measurement Template
A blank opening schedule for dimensions, mounting, materials, motor, power, controls and quantities.
Measurement
BOQ / RFQ Template
A blank project line-item template for a reviewable quotation request.
Model-Level Technical Data
Review the system dimensions, mounting conditions and model-specific Motionblinds motor options associated with the QinNong Bank project.
Selection & Guides
Browse the product systems and Guides & Resources for product selection, measurement preparation and control topics.
Controls & Integration
Use the Control Center and Lutron integration page before specifying a control path.
Quality & Compliance
Review Production, QC & Packing, Certificates and the Trust Center.
Projects & Commercial Review
Explore Projects, the Sample Kit, and Warranty & After-Sales.
Qualified-Request Resources
Full price lists, dealer pricing, confidential factory documents, raw certificates, CAD/DWG sets, motor test files and customer-specific engineering documents are supplied only when appropriate to a qualified project. They are not represented as public downloads.
Start With the Resource Kit for Your Buyer Task
Dealer Starter Kit
Use this route to evaluate the range, prepare samples and turn a first or repeat request into reviewable inputs.
Integrator Kit
Use this route to define the motor, power, interface, commands, feedback and project responsibility before quotation.
These kits route existing public-safe resources. They do not create new files, establish third-party compatibility or expose project-specific documents.
New Project-Planning Guides
Prepare the electrical brief or the repeatable BOQ workflow before sending project requirements.
Planning Decision Resource
Already have a schedule and quotation? Use Opening-to-Quotation Dimension Reconciliation to compare IDs, size definitions, units, revisions and unresolved approvals.
Send a Reviewable Request
Attach the completed measurement or BOQ template with drawings, quantities, material direction, motor/power preference, control requirements and destination.