Technical & Project Resources

Public-safe documents and templates organized by the work a dealer, installer, integrator or project team needs to complete.

Direct downloads are clearly separated from project-specific documents that require qualification.

Technical Working Packs

Choose the working resource that matches the project review task. These tools organize inputs; they do not confirm a final configuration.

Controls & Integration

Review compatibility boundaries, wiring inputs and responsibility before selection.

Wiring / Integration Pack

Direct Downloads

Project Qualification

Project Pack

Products, controls, real cases, QC, packing, samples, warranty and RFQ inputs.

Download PDF

Controls

Motor & Control Compatibility Overview

A configuration-scoped public overview; exact motor, controller, gateway and interface remain subject to project confirmation.

Download PDF

Quality

Sample QC Checklist

Example checkpoints only. Actual inspection scope depends on the selected product and order requirements.

Download PDF

Packing

Packing & Labeling Summary

Product-specific protection, long-item planning and conditional room/opening references.

Download PDF

Commercial

Warranty & After-Sales Summary

A concise explanation of configuration-specific warranty and evidence-led issue review.

Download PDF

Commercial

Sample Evaluation Process

Sample purpose, configuration, pricing, freight, approval and move-to-order workflow.

Download PDF

Measurement

Measurement Template

A blank opening schedule for dimensions, mounting, materials, motor, power, controls and quantities.

Download XLSX

Measurement

BOQ / RFQ Template

A blank project line-item template for a reviewable quotation request.

Download XLSX

Model-Level Technical Data

Review the system dimensions, mounting conditions and model-specific Motionblinds motor options associated with the QinNong Bank project.

Selection & Guides

Browse the product systems and Guides & Resources for product selection, measurement preparation and control topics.

Controls & Integration

Use the Control Center and Lutron integration page before specifying a control path.

Quality & Compliance

Review Production, QC & Packing, Certificates and the Trust Center.

Projects & Commercial Review

Explore Projects, the Sample Kit, and Warranty & After-Sales.

Qualified-Request Resources

Full price lists, dealer pricing, confidential factory documents, raw certificates, CAD/DWG sets, motor test files and customer-specific engineering documents are supplied only when appropriate to a qualified project. They are not represented as public downloads.

Start With the Resource Kit for Your Buyer Task

These kits route existing public-safe resources. They do not create new files, establish third-party compatibility or expose project-specific documents.

Planning Decision Resource

Already have a schedule and quotation? Use Opening-to-Quotation Dimension Reconciliation to compare IDs, size definitions, units, revisions and unresolved approvals.

Send a Reviewable Request

Attach the completed measurement or BOQ template with drawings, quantities, material direction, motor/power preference, control requirements and destination.

Send Your Project Requirements

Scroll to Top