Coordinated project supply

Motorized Blinds for Multi-Unit Projects

Multi-Unit Motorized Blinds Project Supply & BOQ Coordination

Plan repeated openings without losing the room, unit, product, fabric, motor, control and packing reference for each item. Saiwenna supports document-based review from BOQ and samples through approved configuration, production coordination and export handover.

Buyer fit

A Supply Workflow for Repeated and Mixed Configurations

Use this route when a project contains multiple rooms, units, floors, buildings or repeated opening groups. The same workflow can also support large dealer or distributor orders where labels, packing, documentation and repeat-order continuity matter.

Developers and contractors

Keep drawings, schedules, revisions and site responsibilities aligned before release.

Hospitality and multi-family teams

Coordinate room types, layers, mock-ups, labels and phased handover without treating every opening as identical.

Dealers and integrators

Freeze product, control, packing and support inputs for repeatable local delivery and installation.

Project information

Start With One Controlled Window Schedule or BOQ

Each line should remain traceable to its room, unit or opening. Group identical configurations only after the product, dimensions, material, motor/control path and mounting condition are confirmed.

Required field Buyer purpose Review boundary
Building, floor, room, unit and opening ID Supports labels, packing and installation handoff Use the same identifiers across schedule and drawings
System, size and quantity Separates product and configuration groups Keep unlike dimensions or systems on separate lines
Fabric, finish and opacity direction Controls visual and functional selection Final approval follows the selected series/sample
Motor, power and control requirement Defines the technical path Final equipment is model- and project-specific
Mounting and installation condition Coordinates brackets, recesses, pockets and access Site structure and installation remain project responsibilities

Download Window Schedule / Measurement Template (XLSX) · Download BOQ / RFQ Template (XLSX)

Configuration control

Keep Every Revision Reviewable

1. Initial Scope & Revision

Record the schedule and drawing revision used for the first review.

2. Product shortlist

Map each opening group to a documented system direction.

3. Sample or mock-up

Confirm fabric, finish, visible details and operation where required.

4. Approved configuration

Freeze the accepted schedule, accessories and control responsibilities.

5. Production release

Release only approved item groups and record later changes separately.

6. Handover record

Align QC, labels, packing, documents and destination with the released schedule.

Mixed project requirements

Separate Product, Power and Control Groups

A project can contain manual and motorized products, different fabrics, different power directions or different control groups. Do not collapse them into one generic line. The schedule should make each approved difference visible.

Product groups

Roller, zebra, cellular, venetian, Roman and curtain-track systems remain distinct selections.

Power groups

Wired, low-voltage, rechargeable or other documented paths require their own model review.

Control groups

Local, grouped, dry-contact, RS485, app/gateway or project-platform requirements must stay traceable to selected equipment.

Approval before repetition

Use Samples and Mock-Ups at the Right Stage

A fabric sample, color card, product sample or representative room mock-up can help the team confirm visual direction and visible details before a repeated configuration is released. The approval record should identify exactly what was reviewed and which schedule revision it applies to.

  • Fabric, color, texture and opacity direction
  • Mounting, cassette, channel, track or visible hardware
  • Selected motor/control behavior where a representative test is required

Release and QC

Tie Production Checks to the Approved Schedule

Quality checks should use the released product configuration and item identifiers. Required inspection records, accessories and documentation depend on the confirmed order scope; one project workflow is not a catalog-wide performance claim.

Before production release

Confirm schedule revision, approved material, dimensions, product build, motor/control path, accessories and destination.

Before shipment handover

Review item identification, agreed QC records, accessories, packing sequence and applicable shipping documents.

Packing and delivery

Plan Labels, Spares and Phased Handover Before Packing

Where agreed for the project, packing can be coordinated around room, unit, floor, building or installation sequence. Spare motors or components and phased delivery require an approved commercial and technical scope; they are not included automatically.

Labels

Use project identifiers that match the approved BOQ or window schedule.

Packing groups

Define carton grouping and accessory separation before production handover.

Delivery stages

Confirm destination, release sequence, shipping documents and local receiving responsibility.

Responsibility boundary

Name the Owner of Every Project Handoff

Scope Typical project owner What must be confirmed
Opening schedule and drawings Buyer, designer, contractor or project team Current revision, dimensions and identifiers
Product configuration and quoted supply Saiwenna within the confirmed scope System, material, motor/control, accessories and quantity
Site structure, power and wiring Contractor, electrician or appointed installer Approved provisions, access and local requirements
Third-party programming and commissioning Customer-appointed integrator Platform, interface, commands, feedback and acceptance plan
Import, receiving and local installation Buyer-appointed parties unless otherwise agreed Delivery term, destination and handover responsibilities

Quotation checklist

What to Send for a Multi-Unit Project Review

  • Current window schedule or BOQ
  • Plans, elevations, sections or representative opening details
  • Room/unit identifiers and quantity by configuration
  • Product, fabric and finish direction
  • Sample or mock-up requirement
  • Country, project type and delivery destination
  • Power and control requirements
  • Installation and integration responsibility
  • Project stage and required review date
  • Labeling, packing, spares or phased-delivery needs if applicable

Keep Opening and Door IDs Traceable to Quoted Lines

Keep a stable opening ID even when a room name or quote revision changes. Map building, floor, unit/room, opening and door/window reference to the quote line. A repeated room type is not a substitute for identifying each supplied item.

Synthetic identifier crosswalk
Building / floor Unit / room Opening / door-window ID Quote reference
DEMO-A / 02 U-201 / Living OP-201-01 / W-01 Q-RevB / line 010
DEMO-A / 02 U-201 / Terrace door OP-201-02 / D-01 Q-RevB / line 011
DEMO-B / 03 U-301 / Bedroom OP-301-01 / W-02 Q-RevB / line 020

Synthetic IDs only. Keep quantity, size, fabric and motor/control group in the owning schedule. Use Opening-to-Quotation Dimension Reconciliation when IDs or size definitions do not agree.

Common Project-Control Risks

These are planning risks, not reported Saiwenna project failures.

Schedule control risks
Risk What can go wrong Prevention / record required
Revision mismatch Quotation or production refers to an outdated drawing Dated revision register and explicit affected-line approval
Opening / room ID mismatch The right product is allocated to the wrong opening Stable ID crosswalk through quote, label and installation schedule
Mixed power/control groups Unlike configurations are combined Separate model, supply and command-group columns
Sample/configuration mismatch An approval is applied beyond its intended scope Sample/mock-up approval tied to exact configuration and revision
Packing/install sequence mismatch Site receives items without a usable location sequence Agreed carton/label groups and receiving responsibilities
Spare-part identification gap A replacement cannot be matched to the installed item Retained model/component and opening references within the agreed spare scope

After Initial Review, What the Project Team Receives

  • Configuration groups and openings requiring separate selection.
  • An open-question list with the schedule or drawing reference for each item.
  • A quotation basis showing the product, quantity and revision used.
  • Sample/mock-up questions that must be settled before repetition.
  • Control/interface confirmations and the responsible parties.
  • Labeling, packing, phased-delivery and release-status items requiring agreement.

The review organizes the next decisions; it does not release unresolved items or substitute for site measurement. Use the dimension reconciliation checklist to close quote-versus-opening exceptions before release.

Ready to Build a Reviewable Multi-Unit Schedule?

Send the BOQ or opening list, drawings, product direction, power/control requirements, destination and project stage. We will identify the information needed to freeze the quoted supply scope.

JD.com Headquarters Project Reference

JD headquarters exterior in Beijing Yizhuang

Commercial headquarters project reference with multi-zone manual, motorized and specialty shading context.

View JD.com Headquarters Project Reference

Scroll to Top