Curtain-track project preparation
Curtain Track Selection Guide and Working Pack
Prepare a reviewable track request by coordinating the route, opening references, curtain inputs, mounting condition and project responsibilities.
What this resource does and does not confirm
The pack records buyer inputs and review points. It does not confirm a final track, drive, load, radius, fixing method or control configuration.
The CC-B112 data sheet (PDF) provides a model reference for a center-opening pleated-curtain configuration. Use this selection pack to organize your route, curtain, mounting and control inputs for review.
Safe selection framework
- Map the route. Reference every opening and show the planned track route, shape, dimensions and opening intent.
- Coordinate the surrounding condition. Record curtain, mounting, recess, access and maintenance inputs supplied by the project team.
- Prepare the project handoff. Bring power, cable route, responsibility, drawing revision, approval and logistics inputs into one reviewable submission.
Required project inputs
- Buyer role. State the role coordinating the request so review questions reach the correct project discipline.
- Project type. Describe the project context so the working file can be organized around the buyer's task.
- Track route or shape. Show the planned route, turns, junctions and end conditions on the referenced drawing.
- Location identifiers. Use the project's floor, room and opening labels consistently across drawings and schedules.
- Opening geometry. Record project dimensions and the measurement basis for each identified opening.
- Curtain fabric, weight and fullness. Record the curtain information and fullness intent supplied by the project team. For the parked fabric and desired clear opening, review curtain stack-back planning before confirming the track layout.
- Mounting condition. State the proposed mounting or recess condition and identify surrounding constraints.
- Opening intent. Record the required movement or opening intent using the project drawing as reference.
- Access and maintenance. Record the proposed access route and maintenance responsibility for project review.
- Drive-selection inputs. Record the requested drive position and selection inputs; leave final equipment fields for project review.
- Power-supply inputs. Record the project power information supplied by the electrical team without inferring equipment suitability.
- Control requirement and protocol. Describe the requested control outcome and any protocol identified by the project controls team.
- Cable route and power point. Mark proposed cable routes, handoff points and power-point locations on the coordinated drawing.
- Installation responsibility. Record the proposed responsibility for preparation, installation, connection, testing and approval.
- Drawing revision reference. Identify the drawing issue and revision used for the submission.
- Approval and sample submittal. List the samples, finishes or submittals that the project team needs to review.
- Project destination. State the destination needed for document, delivery and coordination review.
- Delivery, trade term and timing. State the destination basis, requested trade term and project timing for quotation review.
- Packing and label grouping. Describe how finished items should be grouped and identified for site receipt.
- Quantity. Provide quantity by opening or item group and keep unlike configurations separate.
Use the working download
Download the blank working resource, complete only known project inputs, and keep uncertain selections open for review.
Continue the project workflow
CC-B112: Component Map and Supply-Scope Check
A documented assembly is the starting point for a complete, reviewable track request. This companion resource provides a document-based review aid; final configuration and supply scope require confirmation.
For the configuration questions behind this map, distinguish rail, belt and carrier connections, read load ratings in their stated conditions, and confirm pleated versus wave heading hardware before treating the reference as a complete supply list.
Download CC-B112: Component Map and Supply-Scope Check (PDF)
Curtain Draw and Carrier Handoff Worksheet
Record the drawing view, opening arrangement, heading hardware and sample question before confirming the supplied track configuration. This fillable worksheet is a review record, not an installation or supply approval.
Download Curtain Draw and Carrier Handoff Worksheet (fillable PDF)